Complete Guide to HDB Renovation Permits in Singapore
Everything you need to know about permits, approvals, and timelines for HDB renovations
Understanding HDB Renovation Permits Renovating your HDB flat requires proper permits from the Housing & Development Board. This guide walks you through every step of the process. When Do You Need a Permit? A renovation permit is required for most structural and non-structural works in your HDB flat. This includes hacking of walls, changing floor tiles, installing new electrical points, and modifying plumbing. Application Process • Engage a licensed contractor – Only HDB-registered contractors can apply for permits on your behalf. • Submit application – Your contractor submits the renovation plan through HDB's e-services portal. • Wait for approval – Typically takes 3-5 working days for non-structural works. • Renovation period – Works must be completed within the approved timeline (usually 3 months). Renovation Hours HDB enforces strict renovation hours: • Weekdays: 9:00 AM – 6:00 PM • Saturdays: 9:00 AM – 1:00 PM • Sundays and Public Holidays: No renovation allowed Common Mistakes to Avoid • Starting work before the permit is approved • Hacking structural walls without engineering assessment • Exceeding approved renovation scope • Working outside permitted hours Cost of Permits Permit fees range from $0 for minor works to $200+ for major structural changes. Your contractor typically includes this in their quotation. Need help finding a licensed contractor? Use our matching tool to get connected with vetted professionals.
Planning a renovation?
Get matched with vetted firms that fit your budget and style — free.
Get matched